Experience the ultimate Indian road trip on the scenic NH66 coastal highway from Mumbai to Goa. This 2-day ride takes you through the winding Western Ghats, past the Vashishti River, and into the heart of the Konkan region. Enjoy authentic Malvani seafood, misty mountain passes, and a glorious arrival at Goa's golden beaches. While construction delays persist, particularly around Lanja, Sangameshwar, Panvel, and Indapur, with some bypasses and flyovers still experiencing slow progress and causing choke points, the highway is implementing a new satellite-based smart toll system in Maharashtra. Note that full seamless connectivity on NH66 is now expected by late 2027, not May 2026. Travelers should be aware that while IMD alerts for widespread to heavy rainfall, thunderstorms, gusty winds, and potential landslides were active in the Konkan region and Goa through late August, the India Meteorological Department has issued 'No warning' for Konkan & Goa from September 2 to October 8, 2026. However, isolated to scattered rainfall is forecast over Konkan & Goa and Madhya Maharashtra during October 1-7, 2026, and hot and humid weather is likely over coastal Maharashtra and Konkan & Goa during October 2-5, 2026. Additionally, a traffic diversion is in effect on NH66 between Bambolim and Holy Cross from August 25 to October 31, 2026, for foot overbridge construction and roadwork. Traffic from the LHS service road is diverted to the main carriageway. A new traffic diversion is also in effect on NH66 in Goa from September 22 to October 31, 2026, for toll plaza construction, diverting traffic from Mapusa towards Banda, Maharashtra, and at Fakir pata junction (Ch. 476/360 to Ch. 476/660) merging near a petrol pump at Ch. 476/670. Furthermore, four-laning work on the Bendurdem-Canacona section of NH66 in Goa commenced on September 9, 2026, with land-filling and construction activities scheduled to start in October. The NH66 stretch between O'Coqueiro Junction and Mall de Goa is also closed from August 24, 2025, to January 31, 2026, for six-lane elevated corridor construction, with traffic towards Panaji diverted via B. B. Borkar Road.

Meet at McDonald's Kalamboli or start from Panvel. Fuel up full tank at the BPCL pump near Palaspe Phata.
0 km
Mandatory pitstop for bikers. Try their iconic Vada Pav, Misal Pav, and Kothimbir Vadi. 45 min break.
15 km
Choose the new tunnel for speed (15 mins) or the old Ghat road for breathtaking views of the valley. Watch for monkeys. Note: A landslide occurred at Kashedi Ghat around mid-July 2026, causing diversions for Mumbai-bound traffic to the Goa-bound carriageway. Exercise caution and expect delays.
140 km
Reach Chiplun. Check into Hotel Reemz or a riverside resort. Lunch at Hotel Abhishek for fresh seafood.
250 km

Start early to beat the heat. Ride through the scenic Parshuram Ghat section towards Ratnagiri. Be aware of the region's high landslide susceptibility and recent IMD warnings for heavy rain and thunderstorms.
0 km
Stop at Hotel Amantran or roadside eateries near Hathkhamba junction. Famous for Solkadhi and fish fry.
90 km
Quick stretch and tea break. The road here is wide and smooth (concrete 4-lane).
230 km
Cross the border at Patradevi. Welcome to Goa! Head towards Arambol or Calangute to end the trip. Note: A traffic diversion is in effect on NH66 between Bambolim and Holy Cross from August 25 to October 31, 2026, for foot overbridge construction and roadwork. Traffic from the LHS service road is diverted to the main carriageway. Additionally, a new traffic diversion is in effect on NH66 in Goa from September 22 to October 31, 2026, for toll plaza construction, diverting traffic from Mapusa towards Banda, Maharashtra, and at Fakir pata junction (Ch. 476/360 to Ch. 476/660) merging near a petrol pump at Ch. 476/670. Four-laning work on the Bendurdem-Canacona section of NH66 in Goa commenced on September 9, 2026, with land-filling and construction activities scheduled to start in October. The NH66 stretch between O'Coqueiro Junction and Mall de Goa is also closed from August 24, 2025, to January 31, 2026, for six-lane elevated corridor construction, with traffic towards Panaji diverted via B. B. Borkar Road. Expect potential delays and plan your route accordingly.
330 km
Per-day cost breakdown locked.
Unlock to see fuel, stay, food, and activity estimates.
21-item route-specific packing list locked.
Tuned for this route's terrain, weather, and altitude.
Both days are yours to read
Nothing on this page is hidden — the pass is for taking it on the road.
✓ Verified 8 days ago by a partner rider