Experience the ultimate Himalayan loop from Manali to the serene Lahaul Valley. This 3-day couple's getaway combines the thrill of high-altitude snow with romantic glamping near the Sissu Waterfall. Return via the engineering marvel of Atal Tunnel for a perfect mix of adventure and leisure. Note that Rohtang Pass reopened for tourist traffic on May 17, 2026, though this trip's route to Sissu remains via Atal Tunnel. Alternate snow experiences are available near Solang Valley, Gulaba, and the Atal Tunnel area. An entry tax of ₹100 per private car is applicable for out-of-state vehicles entering Himachal Pradesh, effective April 1, 2026; however, recent protests against this tax led to a four-hour road blockade on June 1, 2026, and a symbolic 'Khalsa tax' collection on June 4, 2026, near Kiratpur Sahib, which may cause travel disruptions. Travelers should be aware that the southwest monsoon is withdrawing from Himachal Pradesh, with dry weather predicted until October 4, 2026, and light showers expected on October 5 and 6. As of October 1, 2026, 45 roads remain blocked across the state, with 5 in Kullu district and none in Lahaul and Spiti. Lingering monsoon damage may still cause temporary road diversions and bottlenecks, particularly between Mandi and Kullu around Pandoh Dam and Khotinalla. The Lahaul-Spiti administration has stepped up preparedness against a potential glacial lake outburst flood (GLOF) from the expanding Ghepan Lake above Sissu village, identifying 32 vulnerable locations. An early warning system was scheduled for installation in September 2026, and a Geological Survey of India (GSI) team concluded a 14-day scientific assessment of the lake around September 14, 2026. Recent assessments indicate that in the event of an outburst, floodwaters could reach populated areas within five minutes, significantly reducing response time. This could affect local infrastructure and the Atal Tunnel area.

Depart early. Fuel up at the Indian Oil pump on NH3 Manali. Note: Rohtang Pass is currently closed for the winter season. The route to Sissu will be via Atal Tunnel. Be aware that the southwest monsoon is withdrawing, with dry weather predicted until October 4, 2026. As of October 1, 2026, 45 roads remain blocked across Himachal Pradesh, with 5 in Kullu district and none in Lahaul and Spiti. Lingering monsoon damage may still cause temporary road diversions and bottlenecks, particularly between Mandi and Kullu around Pandoh Dam and Khotinalla. Check local advisories before departure.
0 km
Drive towards the South Portal of Atal Tunnel. This replaces the stop at Marhi as the route has changed.
25 km
Enter the 9.02 km Atal Tunnel. After exiting the North Portal, you are in Lahaul Valley.
34 km
Drive along the Chandra River to Gramphu junction. Take the sharp LEFT turn towards Koksar/Sissu (Right goes to Spiti).
45 km
Check into your glamping stay (e.g., La Hault or The Alpinist). Relax and enjoy the quieter side of the Himalayas.
50 km

Enjoy breakfast at your camp watching the sunlight hit the Gyephang Goh peak.
0 km
Take a short hike (30 mins) to the base of the massive Palden Lhamo Dhar waterfall. Great spot for couple photos.
2 km
Visit the Himachal Tourism 'Atal Café' or local food points near the helipad for lunch.
3 km
Walk around the man-made Sissu Lake. Adventurous couples can try the zip-line across the river.
4 km
1 more day locked
40 km · 2-3 hours · 4 timed stops
✓ Verified 8 days ago by a partner rider
Drive towards the North Portal of Atal Tunnel. The road is smooth and scenic. Be aware that the southwest monsoon is withdrawing, with dry weather predicted until October 4, 2026. As of October 1, 2026, 45 roads remain blocked across Himachal Pradesh, with 5 in Kullu district and none in Lahaul and Spiti. Lingering monsoon damage may still cause temporary road diversions and bottlenecks, particularly between Mandi and Kullu on the approach to Manali. Check local advisories before departure.
Enter the 9.02 km tunnel. Maintain speed limit (60 kmph). No stopping allowed inside. Note: Tourist movement, stopping, parking, and commercial activities are strictly restricted in avalanche-prone zones near the North Portal as per an order issued by the Lahaul-Spiti administration on April 2, 2026, due to serious safety concerns. A safety audit of the Atal Tunnel was conducted on June 2, 2026, due to increased traffic. Additionally, be aware of a potential flood risk from the expanding Ghepan Lake above Sissu village; the Lahaul-Spiti administration is actively preparing for a potential glacial lake outburst flood (GLOF), identifying 32 vulnerable locations. An early warning system was scheduled for installation in September 2026, and a Geological Survey of India (GSI) team concluded a 14-day scientific assessment of the lake around September 14, 2026. Recent assessments indicate that in the event of an outburst, floodwaters could reach populated areas within five minutes, significantly reducing response time. This could affect the tunnel and surrounding areas.
Exit at South Portal and drive to Solang Valley. Optional paragliding or ATV ride.
End the trip with an Italian lunch at this iconic riverside cafe in Old Manali.
+ 3 more stops in this day
Per-day cost breakdown locked.
Unlock to see fuel, stay, food, and activity estimates.
17-item route-specific packing list locked.
Tuned for this route's terrain, weather, and altitude.