Escape to the 'Land of Eternal Spring' on this refreshing 3-day drive from Agartala to Jampui Hills. Be prepared for potential access issues due to likely thunderstorms and heavy rainfall. The India Meteorological Department (IMD) has issued alerts for isolated heavy rainfall over Tripura on October 13, 2026, which could cause severe damage and traffic standstills on sections of NH8. Note that a 12.8 km section (Km 6.500 to Km 19.300) of the Agartala-Khowai highway (NH-108B) has been completed as of September 9, 2026. Maintenance work on other parts of NH-108B (Khowai-Agartala stretch) was scheduled for completion by September 30, 2026, ahead of Durga Puja. While initial Smart City Mission projects in Agartala are largely complete, new ADB-funded smart road projects and the Panchabati-Battala corridor project are underway. Major upgradation works on HGB Road and Akhaura Road, including DBM laying, have seen recent progress with some sections completed as of early October 2026, though other works continue. These projects, expedited for pre-Durga Puja completion, may still cause significant traffic congestion and dust at the start and end of your journey. Navigate winding roads, noting that sections from Kanchanpur towards Jampui Hills (Vanghmun) are in poor condition with broken sections, narrow stretches, and weak wooden bridges. Be aware of ongoing major 4-laning construction on NH8 between Mungiakami and Champaknagar, which impacts the Atharamura ranges. Tripura is expected to introduce toll collection on selected national highways in the near future; additionally, new graded overloading fees are in effect from April 15, 2026, payable via FASTag or UPI, with penalties of 2x for 10-40% excess load and 4x for over 40% excess load. Continue through the Atharamura ranges to reach the pristine Vanghmun village and the cloud-covered Betlingchhip Peak. The journey concludes with a mystical detour to the massive rock carvings of Unakoti.

Depart early to avoid city traffic, which may be exacerbated by ongoing ADB-funded smart road projects and the Panchabati-Battala corridor project causing congestion and dust. Major upgradation works on HGB Road and Akhaura Road, including DBM laying, have seen recent progress with some sections completed as of early October 2026, though other works continue. These projects were expedited for pre-Durga Puja completion. Head towards NH8, being aware of potential delays due to severe damage. Maintenance work on sections of the Agartala-Khowai highway (NH-108B) was scheduled for completion by September 30, 2026, ahead of Durga Puja, with a 12.8 km section (Km 6.500 to Km 19.300) completed as of September 9, 2026. Fill up tank at the Indian Oil pump near Khayerpur.
0 km
Stop at a roadside eatery near the forest check post for tea and local snacks. Drive carefully through the Atharamura hill range.
45 km
Halt at Ambassa, the Dhalai district HQ. Good lunch options like Hornbill Restaurant or Crown Chef.
85 km
Reach Kanchanpur. Buy water and snacks here as shops are limited uphill. Begin the steep 35km ascent to Jampui, navigating poor road conditions with broken sections, narrow stretches, and weak wooden bridges.
170 km
Check into Eden Tourist Lodge or a local homestay. Enjoy the sunset view from the lodge balcony.
210 km

Watch the sun rise over the Mizoram hills. The sea of clouds in the valley below is spectacular.
0 km
Drive to the base and take a short trek to Betlingchhip (930m), the highest peak in Tripura. 360-degree views of Bangladesh and Mizoram.
15 km
Return to Vanghmun for lunch. Walk through the village, famous for being the cleanest in the state, with flower-lined streets.
30 km
Visit local orange orchards (seasonal) or coffee plantations. Relax at the lodge with evening tea.
40 km
1 more day locked
210 km · 7-8 hours · 4 timed stops
✓ Verified today by a partner rider
Descend back to Kanchanpur and drive towards Kumarghat. Take the turn towards Kailashahar.
Visit the majestic Unakoti archaeological site. Marvel at the massive bas-relief sculptures of Shiva carved into the hill.
Grab a meal at a local restaurant in Kailashahar town before hitting NH8 for the return leg.
Complete the drive back to Agartala via Ambassa and Teliamura. Be prepared for potential traffic congestion and dust due to ongoing ADB-funded smart road projects and the Panchabati-Battala corridor project as you arrive. Major upgradation works on HGB Road and Akhaura Road, including DBM laying, have seen recent progress with some sections completed as of early October 2026, though other works continue. These projects were expedited for pre-Durga Puja completion. Also, be aware of potential delays due to severe damage. Maintenance work on sections of NH8, such as the Agartala-Khowai highway (NH-108B), was scheduled for completion by September 30, 2026, ahead of Durga Puja, with a 12.8 km section (Km 6.500 to Km 19.300) completed as of September 9, 2026. Trip ends.
+ 3 more stops in this day
Per-day cost breakdown locked.
Unlock to see fuel, stay, food, and activity estimates.
29-item route-specific packing list locked.
Tuned for this route's terrain, weather, and altitude.